Parameter of Mobile middle frame/手机中板参数
DFM lead time/DFM周期 | 2 Days/2天 |
Mold design lead time/模具设计周期 | 3 Days/3 天 |
Mold manufacturing lead time/模具制造周期 | 15 Days/原模12天,复制模15天 |
Mold life/模具寿命 | 100,000 molds/100,000模次 |
Capacity/产能 | 6000/Day per mold(6000/天每套模具) |
Product dimension tolerance/尺寸公差 | A. Key dimension:+/-0.03(重点尺寸:+/-0.03) B. General size:+/-0.1(一般尺寸:+/-0.1) C. Flatness:+0.2/-0(平面度:+0.2/-0) |
Process Description/产品工艺 | Die Casting - Stamping - Polishing -CNC- Drilling&Tapping - Passivation -CCD- Thermal shaping - Radium carving - complete inspection&packaging 压铸-冲压-披锋-CNC-钻攻-钝化-CCD-热整形-镭雕-检包 |